Finish Selections That Stop a North Atlanta Job Midstream
A Johns Creek kitchen does not stall because the framer went on vacation. It stalls because the tile is still three samples on a table and the range hood has a twelve-week lead. We lock the items that stop a crew before we open the walls.
CRM Construction & Renovation sequences bathroom and kitchen work so rough-ins match the fixtures you actually bought. A Pinterest board is not a purchase order.
Name the SKUs that freeze plumbing and electrical
Sinks, faucets, valves, lights, and appliances have model numbers. If those numbers are not on a sheet, the plumber is guessing. Guessing is how a master suite waits three weeks for a tub that does not fit the rough. Photograph the spec sheets, not the mood board.
Lead times belong on the same calendar as demolition
If a window or a custom cabinet is sixteen weeks out, demolition day is not "soon." It is a date that respects that lead. Our process page is how we hold that. Homes in Johns Creek, Alpharetta, and Roswell lose weeks this way every summer.
One decision owner, not a family group chat
Selections die in a thread with six opinions. Name who signs. If a spouse is traveling, delay the start, do not start and then pause. Browse the gallery after you can also point to the approved finish list.
What we need before we schedule demo
Approved plumbing fixtures, lighting, appliances, and tile, or a written allowance with a drop-dead date. Owners across our service areas, including Roswell and Sandy Springs, can contact us when they want the freeze list named. Read about our team and how general contracting keeps trades moving on decided products, not on maybes.
Ready to lock selections before the schedule depends on them?
Send the rooms in play, lead-time worries, and any items already chosen. We will put remaining selections on the calendar before crews wait.